EAM-T4AS

eam-raft

APPROVALS

USA: FAA TSO-C70a, Type I
Japan: JCAB CARJ Article 152

- For Part 91, 121, 135 Operators (GA, Corporate, Helicopter, Air Taxi)
- Twin Tube Transport Series
- Compact, lightweight. Constructed of Polyurethane.
- High tech inflation system
- Competitively priced

PART NUMBER: R1200-XXX

SPECIFICATIONS

Capacity

Rated: | Overload: 6 Persons

Approval

USA: FAA TSO-C70a, Type I
Japan: JCAB CARJ Article 152


Color Raft: YellowCarrying case: YellowCanopy:Fluorescent OrangeR1200-4XX:Orange outside Blue insideStabilizing Bags:Fluorescent OrangeR1200-4XX:Orange outside Blue inside
Diameter Raft Tube R1200-1XX, -2XX, -34X, -5XX:8.52" (21.6 cm)R1200-31X, -32X, -33X, 4XX:8.49" (21.6 cm)
Inflated Volume: @ 1.50 psig

Tube 1: 6.42 ft³ (0.182 m³)
Tube 2: 6.42 ft³ (0.182 m³)
Canopy Arch Tube: 1.60 ft³ (0.045 m³)
Total: 14.44 ft³ (0.4089 m³)

Tube Volume Per Person: @ rated capacity 3.21 ft³ (0.0909 m³)
Total Tube Buoyancy 680 lbs. (308 kg)
Buoyancy Per Person: @ rated capacity 170 lbs. (77.1 kg)
Total Deck Area 14.4 ft² (1.34 m²)
Deck Area Per Person: @ rated capacity 3.60 ft² (0.334 m²)
Tube Operating Pressure

Minimum: 1.5 psig (0.10 bar)
Nominal: 2.0 psig (0.14 bar)
Maximum: 3.0 psig (0.21 bar)

Pressure Relief Valves

Open: 2.5 - 3.0 psig (0.17 - 0.21 bar)
Close: 2.0 psig (0.14 bar)

Tube Burst Pressure Over 6 psig (0.4 bar)
Inflation System

Cylinder Size: 110 in³
Cylinder Type: DOT-SP9894 4500 & TC-3HWM310, Steel
Charge Pressure: 4500 psig
Charge Weights: CO₂ : 0.73 to 0.75 lbs. (0.33 to 0.34 kg)
Charge Weights: N₂ : 1.00 to 1.10 lbs. (0.454 to 0.499 kg)

Except R1200-125, -317, -319, -321, -323, -325, -327, -329, -331, -341, -343 use:
Cylinder Size: 110 in³ (1800 cm³)
Cylinder Type: DOT-SP10915 4500 & TC-SU5134 310
Charge Weights: CO₂ : 0.73 to 0.75 lbs. (0.33 to 0.34 kg)
Charge Weights: N₂ : 1.00 to 1.10 lbs. (0.454 to 0.499 kg)

Environmental Limits
Temperature
Humidity

Up to 95% relative humidity

Altitude -2000 to 45,000 ft. above sea level
Service Life

Indefinite if raft continues to pass periodic maintenance inspection

Frequency Of Inspection

36 months from the date of manufacture for first maintenance inspection, every 36 months for subsequent inspections