EAM-T25

eam-raft

APPROVALS

USA: FAA TSO-C70a, Type I
Australia: CAA CAO 103.15
Germany: LBA 40.320
Japan: JCAB CARJ Article 152

- For Commercial Airlines and Air Cargo use
- Twin tube
- Compact, lightweight. Constructed of Polyurethane.
- High tech inflation system
- Competitively priced

PART NUMBER: R0372AXXX

SPECIFICATIONS

Capacity

Rated: | Overload: 37 Persons

Approval

USA: FAA TSO-C70a, Type I
Australia: CAA CAO 103.15
Germany: LBA 40.320
Japan: JCAB CARJ Article 152


Color Tube: YellowCanopy: Fluorescent OrangeCarrying Case: Yellow
Diameter Raft Tube 13.5" (34.3cm)
Inflated Volume: @ 1.50 psig

Tube 1: 38.05 ft³ (1.08 m³)
Tube 2: 38.05 ft³ (1.08 m³)
Total: 76.1 ft³ (2.15 m³) @ 2.0 psig

Tube Volume Per Person: @ rated capacity 3.04 ft³ (0.0861 m³)
Total Tube Buoyancy 4,747 lbs. (2153 kg)
Buoyancy Per Person: @ rated capacity 189.9 lbs. (86.1 kg)
Total Deck Area 90.2 ft² (8.38 m²)
Deck Area Per Person: @ rated capacity 3.61 ft² (0.335 m²)
Tube Operating Pressure

Nominal: 2.0 psig (0.14 bar)

Pressure Relief Valves

Open: 2.5 - 3.0 psig (0.17 - 0.21 bar)
Close: 2.0 psig (0.14 bar)

Tube Burst Pressure Over 6 psig (0.4 bar)
Inflation System

R0372A1XX:
Cylinder Size: 295 in³
Cylinder Type: DOT-3AA2100 & TC-3AAM161, Steel
Charge Pressure: 2100 psig
Charge Weights: CO₂: 6.18 to 6.22 lbs. (2.80 to 2.82 kg)

R0372A3XX:
Cylinder Size: 285 in³
Cylinder Type: DOT-SP11194 & TC-3CCM, Composite
Charge Pressure: 4500 psi
Charge Weights: CO₂ : 0.30 to 0.32 lbs (0.14 to 0.15 kg)
Charge Weights: N₂ : 3.10 to 3.25 lbs (1.41 to 1.47 kg)

Environmental Limits
Temperature
Humidity

Up to 95% relative humidity

Altitude -2000 to 45,000 ft. above sea level
Service Life

Indefinite if raft continues to pass periodic maintenance inspection

Frequency Of Inspection

R0372A1XX:
12 months from in-service date or 24 months from date of manufacture for first maintenance inspection, every 12 months for subsequent inspections

R0372A3XX:
36 months from last compressed gas cylinder hydro test date for first maintenance inspection, every 36 months for subsequent inspections